Chandrayaan-1 was launched on 22 October 2008 at 6.22 am IST from Satish Dhawan Space Centre using ISRO's 44.4 metre tall four-stage PSLV launch rocket, and it took 21 days to reach final lunar orbit. ISRO's telemetry, tracking and command network (ISTRAC) at Peenya in Bangalore, will track and control Chandrayaan-1 over the next two years of its life span.[33]
Chandrayaan-1 was sent to the Moon in a series of orbit-increasing manoeuvres around Earth instead of a direct shot to the Moon.[34] At launch the spacecraft was inserted into geostationary transfer orbit (GTO) with an apogee of 22,860 km and a perigee of 255 km. The apogee was increased with a series of five orbit burns conducted over a period of 13 days after launch.[34]
First orbit burn
The first orbit-raising manoeuvre of Chandrayaan-1 spacecraft was performed at 09:00 hrs IST on 23 October 2008 when the spacecraft’s 440
No comments:
Post a Comment